Our scope for Phase 1 included structural documents for the foundation, baseplate and anchor bolt design for the new concrete batch plant, a new foundation for the new concrete batch plant.
Phase 2 – Renovations to Pre-Engineered Building Interior Enviro Equipment
Our scope for Phase 1 included the design of the baseplates and anchor walls to the foundation walls, design the hopper pit grating, truck support and vehicular guard.
Contract Documents and Contract Administration services were provided for the structural portion of the project.